2016 | Revamping of last furnace with composite electrodes |
2013/14 | Revamping of two furnaces with composite electrodes |
2011 | Revamping of one furnace with composite electrodes |
2010 | Start-up of 3rd casting implement for the production of Silocast |
2009 | Revamping of furnace No. 4 with new electrode system |
2008 | Comissioning of another baghouse filter with 400.000 m³/h capacity |
2004 | Improvement of the metal-transport by increasing the size of casting ladles |
2002 | The production of “RW-Füller Q1” takes the demands of high grade Mikrosilica. Increase of the storage capacity for 250 m³ |
2001 | Start-up of two automatic raw material preparation plants |
1999 | Start-up of a second baghouse with 400.000 m³/h. Increase of the production from 20.000 to 26.000 metric tons per year |
1998 | Change from VAW aluminium AG to Graphit Kropfmühl AG on October 1st |
1997 | Installation of tap hole de-dusting units to collect the fine dust |
1995-1996 | Start-up of two casting machines for Silicon-Metal. The high grade product “Silcocast” is selled to the Chemical Industry for the production of silicones |
1976 | Start-up of a filter baghouse to clean the off-gases (production of Silica-Fume) with a capacity of 800.000 m³/h |
1969 | The production is more and more changed to Silicon Metal |
1955 | Extension of the furnace building and start-up of a 4th furnace |
1948-1951 | Start-up of three Ferrosilicon-furnaces with a total load of 17 MW |
1947 | The Vereinigte Aluminiumwerke (VAW) get the permission to produce Ferrosilicon (FeSi 45/ 75/ 90), which is needed in steel production |